Looking south from Nyū: Mount Fuji above a sea of cloud — the morning of 18 September 2026, photo from the party

Yatsugatake Traverse

Japan · Nagano 2026.09.16 – 09.20

WalkedJapan自組團

Download all GPX (zip)
How to import into a map app after downloading?

iPhone (Safari): after downloading, a down arrow appears next to the address bar — tap it to see the file you just downloaded. If you miss it, the file is still in the Files app's Downloads folder, ready whenever you go back for it.

In the Files app, press and hold the file → “Open With” → choose Organic Maps.

iPhone with Chrome: the “…” menu at the bottom right has “Downloads” — the file's there.

Android (Chrome): tapping the link downloads it straight away and a Download complete notification appears; tap the notification to choose which app opens it. Without notification permission for Chrome there is no notification — then find it under Chrome's “⋮” menu → “Downloads”, or your phone's Files app under Download.

Tapping the file brings up a chooser — find Organic Maps by name: it may sit third the first time and jump to the front once you have used it, so go by name, not position. Then tap “Just once” or “Always”.

The first launch of Organic Maps asks for location permission. That is unrelated to importing — the GPX loads either way.

Once imported, it stays in the map app's “Bookmarks & Tracks” — no need to redo it before the next hike.

Full offline map guide → Download the map tiles first, how to check you're still on track on the mountain, and one thing you need to know.

Each map shows that day's route, traced along the actual trail and terrain: the line runs from light to dark as it climbs, with a green dot at the start and a red dot at the finish. The rise and fall below it is that day's elevation, in metres, on the left.

Under forest cover or in a canyon, GPS sometimes drops for a few minutes — those stretches on the map show as straight lines. Recording was on; the GPS simply had no fix. Those are not stretches that went unwalked. Stretches that genuinely weren't recorded are called out separately, in the notice above.

Whole Trip 16 Sep 2026 – 20 Sep 2026

Yatsugatake Traverse
Full route map and elevation profile

Tap a date to see that day's stretch

North is up. This is a sketch, not for navigation; use the GPX to navigate.

5 days of hiking 46.1 km ↑ 3073 m ↓ 3171 m about 25.7 hours 28 landmarks

D1 16 Sep 2026 · 3.5 km · ↑215 m Same stretch 1:28 Taxi before Ogawara Pass, not drawn Ogawara Pass → Mount Futago → Futagoike Hutte

3.5 km ↑ 215 m ↓ 263 m about 2.4 hours 3 landmarks

0 → 4 km of 46 km

D1 Ogawara Pass → Mount Futago → Futagoike Hutte Route map and elevation profile
Same stretch 1:28
Distance, climb, times
StationΣ km↑↓Arr.Dep.
Ogawara Pass0.010:03
Mount Futago0.8132010:4611:01
Futagoike Hutte2.0017211:46

D1 15 Sep 2026

Rest day

Arrival Day

Accommodation only, no hiking.

D2 17 Sep 2026 · 14.8 km · ↑1065 m Shobunsha 4:00Same stretch 5:52 Ogawara forest road on the first stretch · no water after Mugikusa Hutte Futagoike Hutte → Ameike → Mugikusatoge Pass → Mount Maru → Takamiishigoya

14.8 km ↑ 1065 m ↓ 833 m about 7.3 hours 5 landmarks

4 → 18 km of 46 km

D2 Futagoike Hutte → Ameike → Mugikusatoge Pass → Mount Maru → Takamiishigoya Route map and elevation profile
Shobunsha 4:00Same stretch 5:52
ShobunshameFutagoike HutteFutagoike Hutte1:30Ameike3:08Ameike×2.090:50Mugikusatoge Pass …1:31Mugikusatoge Pass …×1.821:40Mount Maru1:13Mount Maru×0.730:23Takamiishigoya
Distance, climb, times
StationΣ km↑↓Arr.Dep.
Futagoike Hutte0.006:58
Ameike7.737834810:0610:07
Mugikusatoge Pass (Mugikusa Hutte)11.525020711:3811:44
Mount Maru13.935617113:1313:26
Takamiishigoya14.4158013:50
D3 18 Sep 2026 · 10.2 km · ↑964 m Same stretch 6:07 Via Shirakoma Pond, Nyu and Higashi-Tengu; they did not go to Nishi-Tengu Takamiishigoya → Shirakoma Pond → Mount Nyu → Mount Naka → Higashi-Tengu → Kuroyuri Hutte

10.2 km ↑ 964 m ↓ 687 m about 6.9 hours 9 landmarks

18 → 28 km of 46 km

D3 Takamiishigoya → Shirakoma Pond → Mount Nyu → Mount Naka → Higashi-Tengu → Kuroyuri Hutte Route map and elevation profile
Same stretch 6:07
ShobunshameTakamiishigoyaTakamiishigoya0:45Shirakoma Pond0:01Shirakomaso1:34Mount Nyu1:30Nakayama Observati…1:22Mount Naka0:32Nakayama Toge0:54Mount Higashi-Tengu0:59Kuroyuri Hutte
Distance, climb, times
StationΣ km↑↓Arr.Dep.
Takamiishigoya0.007:02
Shirakoma Pond1.53317807:4708:05
Shirakomaso2.00008:0608:10
Mount Nyu4.52775909:4410:09
Mount Naka6.52055411:3111:36
Nakayama Toge7.51210212:2712:35
Mount Higashi-Tengu8.72251113:2913:43
Kuroyuri Hutte10.11023414:42
D4 19 Sep 2026 · 11.2 km · ↑488 m Shobunsha 0:05Same stretch 1:15 Downhill through old-growth forest all day · bear country · the itinerary's two junction names do not exist on the ground Kuroyuri Hutte → Nakayama Toge → Midori Pond → Honzawa Onsen

11.2 km ↑ 488 m ↓ 787 m about 6.2 hours 6 landmarks

28 → 40 km of 46 km

D4 Kuroyuri Hutte → Nakayama Toge → Midori Pond → Honzawa Onsen Route map and elevation profile
Shobunsha 0:05Same stretch 1:15
ShobunshameKuroyuri Hutte0:04Nakayama Toge1:14Nakayama Toge–Honz…Midori Pond (Shira…0:05Midori Pond (Shira…0:05Honzawa Onsen–Mido…1:15Honzawa Onsen–Mido…×15.000:17Honzawa Onsen
Distance, climb, times
StationΣ km↑↓Arr.Dep.
Kuroyuri Hutte0.006:29
Nakayama Toge0.20006:3406:41
Nakayama Toge–Honzawa Onsen Junction3.05839507:5407:56
Midori Pond (Shirabiso Hut)3.4112308:0108:31
Honzawa Onsen–Midori Pond Junction6.41508609:4609:50
Honzawa Onsen7.211010:07
D5 20 Sep 2026 · 6.4 km · ↑341 m Same stretch 2:21 About 330 m of climbing to Natsuzawa Pass before the descent begins Honzawa Onsen → Natsuzawa Pass → Oren Hut → Natsuzawa Kosen → Sakuradaira

6.4 km ↑ 341 m ↓ 601 m about 2.9 hours 5 landmarks

40 → 46 km of 46 km

D5 Honzawa Onsen → Natsuzawa Pass → Oren Hut → Natsuzawa Kosen → Sakuradaira Route map and elevation profile
Same stretch 2:21
Distance, climb, times
StationΣ km↑↓Arr.Dep.
Honzawa Onsen0.005:59
Natsuzawa Pass1.7290007:0407:16
Oren Hut2.808907:3907:45
Natsuzawa Kosen4.61124708:1908:24
Sakuradaira5.9016308:42